GateSouth gateS1Offline7 waiting to send

10:0800

Sun 18 October 2026

ع

Working offline7 crossings waiting to send

The day’s list has been kept on this laptop since 08:41: verdicts still work, crossings are recorded here and sent when the link returns.

  1. 1Check
  2. 2Equipment
  3. 3Record
Scene at ⁦11:26⁩
Card read
In

Shadi Jabbour

Outside technician or contractor

Al-Nour Networks

Card number047A 2C4E 81F5 D0Active

Entry allowed

A visit is registered for today and he is within its window.

Needs an escortRecorded offline
Recorded on the laptop, sent later
The visitV-2216Maintenance and technical work

Fibre cabling for building C

Host
Eng. Firas Zeidan
Department
Communications
Needs an escortEquipment declaredWithin the window
06:0011:30 – 15:0020:00
سورياSYاللاذقية442180

Kia Bongo · Blue

Read by the plate camera — matches95%

This crossing’s frames

No signalThe camera lost its link to the system
Face camera
Plate camera